Qulliq Energy Corporation (QEC) would like to inform the residents of Arctic Bay that there will be a planned, community-wide power outage on Saturday, September 18, from 7 a.m. to 1 p.m.
This outage is required to safely begin connecting the new power plant to the community’s existing distribution grid.
QEC thanks residents for their understanding and apologizes for any inconvenience this may cause.
###
Media Contact:
Renee Boucher
Acting Manager, Corporate Communications
Qulliq Energy Corporation
(867) 979-7524
rboucher@qec.nu.ca
File Attachment