Qulliq Energy Corporation (QEC) would like to inform the residents of Cambridge Bay that there will be a planned power outage in a section of the community on Sunday, August 5 from 7 a.m. to 10 a.m. The affected area is highlighted on the map below.
This outage is required to perform repairs and maintenance to the distribution system to improve reliability.
QEC would like to thank the residents for their understanding and apologize for the inconvenience this may cause during this time.
###
Media Contact:
Renee Boucher
A/Manager, Corporate Communications
Qulliq Energy Corporation
(867) 979-7524
rboucher@qec.nu.ca
File Attachment