Qulliq Energy Corporation (QEC) would like to inform the residents of Baker Lake that there will be planned power outages on Saturday, July 30, and Sunday, July 31, from 7:00 a.m. to 12 noon. The affected areas are highlighted in yellow on the maps below.
These outages are required to safely make upgrades to the distribution system to improve reliability.
QEC thanks residents for their understanding and apologizes for any inconvenience this may cause.
###
Media Contact:
Tina Nleya
Director, Corporate Affairs
Qulliq Energy Corporation
(867) 979-7534
tnleya@qec.nu.ca
File Attachment